1. CONTRACTOR will have to make his own arrangements for tools & plants required for the work. The department will not supply any tools and plants unless otherwise specified.
2. The contractor must see the proposed site for the work and study specifications and conditions carefully before tendering. No claim of any sort shall be entertained on account of any site conditions of ignorance of specifications.
3. The site is available, tenderer should see the approaches and conditions of the site. In case any approaches for main road is required at site or existing approach is to be improved and maintained for cartage of materials by the contractors the same shall be provided, improved and maintained by the contractor for stacking materials erection of Go down, site office erection of his plant and machinery etc. at his own cost. The contractor should plan the procurement of materials according to the space available. No claim on account of cost of such works shall be entertained by ITPO.
4. The contractor will have to work according to progress of work decided by the Engineer-in-charge. No claim what-so-ever will be entertained on his account.
5. The contractor shall consult the Executive/Engineer-in-charge in writing regarding collection and stacking of materials in any place other than those approved by the Engineer-in-charge. No excavated earth or building materials shall be stacked on areas for which permission of Engineer-in-charge has not been taken.
6. The contractor must take all precautions to avoid all accidents by exhibiting day and night necessary caution boards, speed limit boards, red flags and red lights and providing barriers. He shall be responsible for all damages and accidents caused due to the negligence on his part. No hindrance shall be caused to Traffic during execution of work.
7. The contractor shall maintain in good condition all work executed till the completion of the entire work allotted to the contractor and handing over of the same to ITPO.
8. No compensation shall be payable to the contractor for any damage caused by rains windstorm or floods during execution of work. He will make good all such damages at his own and no claim on this account will be entertained. The contractor shall bail cut rain water collected during execution of the work from the excavated trenches at his own cost. Nothing extra will be payable on this account.
9. At least one authorized representative should always be available at site of work to take instructions from departmental officers and ensured proper execution of work. This will apply specially for works exceeding more than one lakh.
10. The contractor shall have to work as per program of the department. No claim what-so-ever will be entertained on this account.
11. The classification bricks brought by the contractor shall strictly confirm to the printed CPWD specifications as applicable to ITPO also irrespective of the classifications shown on the permit if there is a permit under which the contractor might have obtained the materials. The contractor shall have no claim as to the quality of bricks on the basis of permit issued to him by the supply department.
12. If the tenderer withdraws his option before award of the work or make any modification in the conditions of the tender which are not acceptable to the India Trade Promotion Organization shall without prejudice to any other right, or remedy, be at liberty to forfeit 50% of the s aid earnest money absolutely.
13. The contractor to whom the work is awarded will have to sign a separate agreement papers and the cost of such stamp paper will be formed by the contract.
14. The work shall be carried out strictly as per CPWD specifications 2007, part I & II with up to date correction slips.
15. The contractor shall take approval from the Sr. Manager (Electrical) in writing for collection and stacking of materials.
16. The contractor must follow CPWD Safety Code as provided in general conditions of contract for CPWD works.
17. Any damage done by the contractor or his workmen to any existing work during the course of execut6ion of the work shall be made good by him at his own cost.
18. Contractor shall clear the site thoroughly of all rubbish etc. left out of his materials immediately on completion of the work and properly clean the site around the building to the satisfaction of the Engg.-in-charge. Otherwise the site will be cleared by the department at his risk & cost to remove and clean the site.
19. The contractor to whom the work is awarded will have to sign the agreement on non judicial stamp papers of Rs. 50.00 and the cost of such stamp paper will be borne by the contractor.
20. Cement bags shall be stacked by the contractor at space provided by ITPO of stipulated quantities at his own cost in his own.
21. Cement shall be kept under double lock system in space provided by ITPO fixed with the door. The key of the lock shall remain with representatives of the Engg.-in-charge at the site of work and that of other with the contractor or his authorized agent. Day to day issue shall be entered in the prescribed register and signed by the contractor or his authorized agent.
22. All incidental charges of any kind whatsoever including cartage, cutting and wastage etc. shall be borne exclusively by the contractor and nothing extra will be paid to him on this account.
Sr. Manager(Elect.)