Percentage Rate
Tender/Item Rate Tender & Contract for Works
(A)
Tender for the work of: SH: Shifting of 150 mm dia water meter from existing location i.e. outside
Gate No.8 to inside the ITPO Premises at Pragati Maidan due to BRT
Corridor
(i)To be
submitted
3.00 p.m.
Hours on
02.03.2009
(Time)
(Date)
(ii)To be opened in presence of tenders who
may be present at 3.30 p.m.
Hours on
02.03.2009
in the office of M (Udaeveer) in room NO 141.
Issued to:
________________________________________________________________________________
(Contractor)
Signature of officer issuing
the documents
Designation:
M (Udaeveer)
Date of issue:
27.2.2009
TENDER
I/We have read and examined the notice inviting tender, schedule, A, B, C,
D, E & F, Specifications applicable, drawings & Designs, General
Rules and Directions, Conditions of Contract, clauses of contract, special
conditions, Schedule of Rate & other documents and Rules referred to
in the conditions of contract and all other contents in the tender
document for the work.
I/We hereby tender for the execution of the work specified for the
President of India within the time specified in Schedule ‘F’, viz.,
schedule of quantities and in accordance in all respects with the
specifications, designs, drawings and instructions in writing referred to
in Rule – 1 of General Rules and Directions and in Clause 11 of the
Conditions of contract and with such materials as are provided for, by,
and in respect in accordance with, such conditions so far as
applicable.
We agree to
keep the tender open for sixty (60) days from the due date of its opening
and not to make any modifications in its terms and conditions.
-2-
CPWD
A sum of Rs 1,500/- has been deposited as per NIT as earnest money.
If I/we, fail to furnish the prescribed performance guarantee within
prescribed period, I/we agree that the said President of India or his
successors in office shall without prejudice to any other right or remedy,
be at liberty to forfeit the said earnest money absolutely. Further,
if I/we fail to commence work as specified, I/we agree that
President of India or his successors in office shall without prejudice to
any other right or remedy available in law, be at liberty to forfeit the
said earnest money and the performance guarantee absolutely, otherwise the
said earnest money shall be retained by him towards security deposit to
execute all the works referred to in the tender documents upon the terms
and conditions contained or referred to therein and to carry out such
deviations as may be ordered, upto maximum of the percentage mentioned in
Schedule ‘F’ and those in excess of that limit at the rates to be
determined in accordance with the provision contained in Clause 12.2 and
12.3 of the tender form. Further, I/We agree that in case of
forfeiture of earnest money or both Earnest Money & Performance
Guarantee as aforesaid, I/We shall be debarred for participation in the
retendering process of the work.
I/We hereby declare that I/we shall treat
the tender documents drawings and other records connected with the work as
secret/confidential documents and shall no communicate information/derived
there from to any person other than a person to whom I/we am/are
authorised to communicate the same or use the information in any manner
prejudicial to the safety of the State.
Dated…………………………..
Signatures of Contractor
Postal Address
Witness:
Address:
Occupation:
ACCEPTANCE
The above tender (as modified
by you as provided in the letters mentioned hereunder) is accepted by me
for and on behalf of the President of India for a sum of
Rs………………………………..(Rupees………………………………………………………………………)
The letters referred to below shall form
part of this contract Agreement:-
(1) Schedule of Quantities NIT
(2)
Additional Conditions.
(3) Wages for workers
(4) Performa for
Agreement
For & on
behalf of President of India
Signature…………………..
Dated…………………
Designation…………………….
-3-
CPWD
SCHEDULES
SCHEDULE ‘A’
Schedule of quantities
(Enclosed)
SCHEDULE
‘B’
Schedule of
materials to be issued to the contractor.
________________________________________________________________________________________
S.No.
Description of item Quantity
Rates in figures & words at which
Place of issue
The material will
be charged to the
Contractor
________________________________________________________________________________________
2. 2
3
4
5
________________________________________________________________________________________
NIL
SCHEDULE ‘C’
Tools and plants to be hired to the contractor
________________________________________________________________________________________
S.No.
Description
Hire charges per day Place of
issue
________________________________________________________________________________________
1.
2.
3
4
_________________________________________________________________________________
NIL
-4-
SCHEDULE
‘D’
Extra schedule
for specific requirements/documents for the work, if any. – N/A
SCHEDULE ‘E’
Schedule of component of Cement, Steel, other materials, Labour
etc. for price escalation.- Nil
CLAUSE 10 CC
Component of Cement – expressed as percent
of total value work.
N/A
Component of Steel-expressed as percent of
total work.
N/A
Component of civil (except cement &
steel)/Electrical construction
N/A
Materials-expressed as percent of total
value of work.
Component of labour-expressed as per cent of total value of work.
N/A
Component of P.O.L. – expressed as percent of total value work.
N/A
SCHEDULE ‘F’
Reference to General Conditions of contract.
Name of work: SH: Shifting of 150 mm dia water meter from
existing location i.e. outside Gate No.8 to inside the ITPO Premises at
Pragati Maidan due to BRT Corridor
Estimated cost of work:
Rs. 72,704/-
(i)Earnest money:
Rs. 1,500/-
(ii)Performance Guarantee
5% of tendered value
(iii)Security Deposit
5% of tendered
value
-5-
CPWD
General Rules &
Direction:
Officer
inviting tender
Manager (C)
Maximum percentage for
quantity of items of work to be executed beyond
Which rates are to be determined in
accordance with Clauses 12.2 & 12.3
12.2
Definitions
2(v) Engineer-in-Charge
M(C)
________________________________________
2(viii) Accepting
Authority
As per DFPR Sch. V of
ITPO
________________________________________
2(x) Percentage
on cost of materials and
15%
Labour
to cover all overheads and profits.
2(xi) Standard
Schedule of Rates
DSR-2007
2(xii) Department
ITPO
(Engg.)
9(ii)
Standard CPWD contract Form
CPWD form 8 as modified & corrected
upto-Sept. 08
Clause 1
(i) Time allowed for submission of
Performance Guarantee
From the
date of issue of letter of acceptance
15
days
(ii) Maximum
allowable extension beyond the period
(Provided in i) above
7
days
Clause 2
Authority for fixing
compensation under clause 2.
GM (W)
Clause 2A
Whether clause 2A shall applicable
No
Clause
5
Number of days from
the date of issue of letter
Acceptance for reckoning date of start
3
days
-6-
CPWD
Mile stone(s) as
per table given below:
Table of Mile Stone(s)
| Sl. No. |
Description of
Milestone(Physical) |
Time allowed in days (from
date of start) |
Amount to be withheld in
case of non achievement of milestone |
| 1. |
Nil |
Nil |
Nil |
| 2. |
Nil |
Nil |
Nil |
| 3. |
Nil |
Nil |
Nil |
| 4. |
Nil |
Nil |
Nil |
| 5. |
Nil |
Nil |
Nil |
| 6. |
Nil |
Nil |
Nil |
Time allowed for
execution of work
25
days
Clause 6,
6A
Clause applicable –
(6 or 6A)
Clause 6
Clause 7
Gross work to be done together with net
payment/adjustment …Rs. 1.00
Lakh.
or advance for
material collected, if any since the last such payment
for being eligible to interim payment
Clause 10A
List of testing equipment to be provided by
the contractor at site lab.
1…………………Nil………………….. 2………………………………….
3…………………Nil………………….
4………………………………….
5…………………Nil………………… 6………………………………….
Clause 10 B(ii)
Whether Clauses 10 B (ii) shall be applicable
No
Clause 10CA
Materials
covered under this clause Nearest Material for which All India
Wholesale Price Index is to be
Followed
1.___________________________
______NA_______________________________________________
2.__________________________
_________________________________________________
3.__________________________
_____________________________________________________
-7-
CPWD
Clause 10CC
Clause 10CC to be applicable in
contracts with stipulated period of
Completion exceeding the period show in text
column
18 months
Clause 11
Specification to be followed for execution
of work CPWD
Specifications 2007, Part I & II with
Up-to-date correction slips.
Clause 12
Deviation limit beyond which clauses 12.2
& 12.3 shall
Apply for
building work
12.2
Deviation
limit beyond which clauses 12.2. & 12.3
Shall apply for foundation work
50%
Clause 16
Competent Authority for deciding reduced
rates.
SM(C)
Clause 18
List of mandatory machinery, tools &
plants to be deployed by the contractor at site:-
1………………NIL………………………….
2………………………………………
3………………NIL……………….
4……………………………………….
5………………NIL…………………………
6……………………………………….
Clause 36(i)
| S.N. |
Minimum qualification of
Technical Representative |
Discipline |
Designation (Principal
Technical/Technical representative) |
Minimum experience |
Number |
Rate at which recovery shall
be made from the contractor in the event of not fulfilling provision
of clause 36(i) |
|
|
|
|
|
|
Figures
Words |
1.
2.
3.
|
Nil |
Nil |
Nil |
Nil |
Nil |
|
Assistant Engineers retired from Government services that are
holding Diploma will be treated at par with Graduate Engineers.
-8-
CPWD
CLAUSE 42
(i)(a)
Schedule/statement for determining theoretical quantity of cement
&
Bitumen on the basis of Delhi Schedule of Rates DSR
2007 printed by C.P.W.D.
(ii)Variations permissible on theoretical quantities.
a)
Cement for works with estimated cost put to
3% plus/minus
Tender not more than Rs. 5
Lakhs
For works with
estimated cost put to tender
2%
plus/minus
More than 5
Lakhs
b)
Bitumen for all works
2.5% plus only & nil on minus
side
c)
Steel Reinforcement and structural steel
2% plus/minus
Sections for each diameter,
section and category
d)
All other materials
Nil
RECOVERY
RATES FOR QUANTITIES BEYOND PERMISSIBLE VARIATION
| S.No. |
Description of Item |
Rates in figures and words
at which recovery shall be made from the contractor |
|
|
|
Excess beyond permissible
variation |
Less use beyond the
permissible variation |
1.
2.
3.
4.
5. |
Cement
Steel reinforcement
Structural
Sections
Bitumen
issued free
Bitumen issued at stipulated fixed price |
2400/-ton |
|
-9-
India Trade Promotion Organisation
(Engineering
Division)
No. 177-ITPO-SMU-II/MCU-III/53/Engg/2008-09
Dated: - 20.2.2009
TENDER
NOTICE
The
Manager (Civil) Engineering Division, Room No.141, India Trade Promotion
Organisation, Pragati Maidan, New Delhi on behalf of CMD, ITPO invite
sealed item rate tenders for the following works from approved
& eligible contractor of ITPO and CPWD & those of appropriate
class of Department of Telecommunication, MES, Railways up to 3.00 PM on 02.03.2009 which will be opened on the same day by him (or)
his authorised representative at 3.30
S.N. |
Name of Work |
Time for
Completion |
Estimated Cost |
Earnest Money |
Cost of
Tender |
1. |
Shifting of 150 mm dia
water meter from existing location i.e. outside Gate No.8 to inside
the ITPO Premises at Pragati Maidan due to BRT
Corridor |
25 days |
72,704.00 |
1,500.00 |
150.00 |
Please note:- A)
Performance guarantee (to be deposited before award of work) - @ 5%
of tendered amount.
B) Security Deposit @ 5%of work
done.
Conditions and
tender forms can be had from the office of the undersigned on production
of PAN NO. , TIN No. and Service Tax No. between 11.00 AM to 3.00
PM on all working days up to 27.2.2009 for the tender cost
mentioned as above (Non Refundable). The earnest money should be deposited
in the name of ITPO alongwith the tender.
The tender document is also available on our
website http://www.indiatradefair.com/ and same can be down loaded and used as
tender document for submitting the tender. However, the cost of
tender form and earnest money as mentioned above is also to be paid in the
shape of Demand Draft issued in favour of ITPO and to be enclosed with the
tender while submitting the tender. In case tender is not
accompanied with the valid document .The tender will summarily be
rejected.
Manager
(civil)
Room No.
141.
.
-14-
India Trade Promotion
Organisation
(Engineering Division)
No. 177-ITPO-SMU-II/MCU-III/53/Engg/2008-09
Dated: - 30.01.2004
CORRIGENDUM –
II
SUBJECT:-
Introduction of performance Guarantee &
revision in rates of Security
deposit
| S. No. |
Existing
Provision |
Revised Provision (to be
applicable now |
| A |
PERFORMANCE GUARANTEE |
|
|
Nil |
The contractor shall be
required to deposit an amount equal to 5% of the tendered value of
the work as performance guarantee in the form of an irrevocable bank
guarantee bond of any schedule bank or state bank of India in
accordance with the form prescribed or in cash or in the form of
Government Security, fixed deposit receipt etc. as in the case of
recovery of security deposit within 15 days of the issue of the
letter of intent but before award of the work. The period can be
further extended by the engineer In-charge up to maximum period of
07 days on written request of the contractor. |
|
SECURITY DEPOSIT |
|
|
10% of the tendered value of
the work put to tender subject to maximum limit of 5.00 lacs |
A sum @ 10% of the gross
amount of the bill shall be deducted from each running bill of the
contractor till the sum alongwith sum already deposited as earnest
money will amount to security deposit of 5% of the tendered value of
the work.
(Bank
Guarantee is not to be accepted as security
deposit) |
-15-
INDIA TRADE PROMOTION ORGANISATION
(Engineering Division)
CORRIGENDUM TO FORM 7/8/9
(CPWD) MUST BE READ ALONGWITH THE PAMPHLET
S.No. |
FOR |
READ |
1. |
Government of
India |
India Trade Promotion
Organisation |
2. |
C.P.W.D. or
Government |
India Trade Promotion
Organisation |
3. |
CPWD -7/8/9 |
CPWD
7/8/9 |
4. |
President/President of
India |
C.M.D
ITPO |
5. |
Chief-Engineer |
General Manager
(Works) |
6. |
Superintending
Engineer |
Dy. General Manager
(Civil)/GM |
7. |
Engineer-in-charge/Divisional Engineer/Executive
Engineer/Divisional Office |
Manager
(Civil) |
8. |
Sub-Divisional
Officer/Asstt. Engineer |
Deputy Manager
(Civil) |
9. |
Administration
Head |
C.M.D. /General
Manager |
10. |
Ministry of Works &
Housing |
ITPO /Ministry of
Commerce |
11. |
CPWD Code,
Paragraph’90 |
Shall be applicable t o
ITPO works |
12. |
DSR’2007 |
Shall be applicable to ITPO
works |
13. |
CPWD specifications 2007
part – I & II |
Shall be applicable to ITPO
works |
14. |
DSR (Internal) 2007 for
Electrical works |
Shall be applicable to ITPO
works |
15. |
CPWD specifications
(Internal) 2007for Electrical works |
Shall be applicable to ITPO
works |
16. |
DSR External 2007 for
Electrical works and specifications |
Shall be applicable to ITPO
works |
17. |
Provision of Section 12
Sub-Section (i) of the works man compensation |
Shall be applicable to ITPO
works |
18. |
CPWD safety Code framed
from time to time |
Shall be applicable to ITPO
works |
19. |
CPWD maternity benefits to
labour |
Shall be applicable to ITPO
works |
20. |
Model Rules of the
protection of health and sanitary appointment for workers employed
by CPWD |
Shall be applicable to ITPO
works |
21. |
CPWD contractor labour
Regulations |
Shall be applicable to ITPO
works |
DEPUTY MANAGER
MANAGER (CIVIL)
18
ADDITIONAL
CONDITIONS
1. The work shall be carried out
strictly as per CPWD specifications 2007, Part I & II with upto date
correction slips.
2.
The contractor shall take approval from the Manager
(Civil)/Electrical in writing for collection and stacking of materials.
3.
The contractor must follow CPWD Safety Code as provided in general
conditions of contract for CPWD Works.
4. Any damage
done by the contractor or his workmen to any existing work during the
course of execution of the work shall be made good by him at his own
cost.
5.
Contractor shall clear the site thoroughly of all rubbish
etc. left out of his materials immediately on completion of the work and
properly clean the site around the building to the satisfaction of the
Engg.-in-Charge. Otherwise the site will be cleared by the department at
his risk & cost to remove and clean the site.
6. The contractor
to whom the work is awarded will have to sign the agreement on non
judicial stamp papers of Rs.50/- and the cost of such stamp paper will be
borne by the contractor.
7.
Cement bags shall be stacked by the contractor
at space provided by ITPO of stipulated quantities at his own cost in his
own.
8.
Cement shall be kept under double lock system in space
provided by ITPO fixed with the door. The key of the lock shall remain
with representatives of the Engg-in-charge at the site of work and that of
other with the contractor or his authorized agent. Day to day issue
shall be entered in the prescribed register and signed by the contractor
or his authorized agent.
9.
All incidental charges of any kind whatsoever
including cartage, cutting and wastage etc. shall be borne exclusively by
the contractor and nothing extra will be paid to him on this
account.
Manager
(Civil)
-19-
India Trade Promotion
Organisation
(Engineering Division)
Categories of Employees
All inclusive
Minimum Rates of
Wages per day
A.
Un-Skilled
| 1 |
Mazdoor |
Rs. 142.00 |
Each Per day |
| 2 |
Mazdoor Coolies |
Rs. 142.00 |
Each Per day |
| 3 |
Helper to Mason, Fitter
Carpenter & Painter |
Rs. 142.00 |
Each per day |
| 4 |
Any other categories doing
un-skilled work |
Rs. 142.00 |
Each per
day |
B. Semi
Skilled
| 1` |
Sewer man |
Rs. 148.00 |
Each Per day |
| 2 |
Chowkidar |
Rs. 148.00 |
Each per
day |
C. Skilled
| 1. |
Glazier |
Rs. 158.00 |
Each per day |
| 2 |
Carpenter |
Rs. 158.00 |
Each per day |
| 3 |
Sanitary Fitter |
Rs. 158.00 |
Each Per day |
| 4 |
Spray men for Road |
Rs. 158.00 |
Each per day |
| 5 |
Mason |
Rs. 158.00 |
Each per day |
| 6 |
Black Smith |
Rs. 158.00 |
Each per day |
DM (Civil)
Manager (Civil)
ITPO
ITPO
-20-
AGREEMENT
AN AGREEMENT is made
this………………………………………………BETWEEN the India Trade Promotion Organisation. A
company Incorporated under the companies Act, 1956 and with its registered
office at Pragati Maidan New Delhi-110 001, which expression shall include
its successor, unless repugnant to or Excluded by the contract here of and
assignees of and represented by its Managing Director, ITPO the first
party (hereinafter called the Authority) and by its sole
proprietor/partners, Managing Director ………………………………………………………….(which
expression shall be including his/its successor’s heirs, executors,
representative and or assignees of the second party (hereinafter called
the contractor).
WHEREAS
the Authority has, under Notification No. ……………………………………………………………………...…
WHEREAS the contractor has
submitted tender for carrying out the work as above as per the tender
document page to and has
represented that in conformity with his/its obligation contained in the
tender as modified by the correction slips and corrigendum contained he/it
shall carryout the same truly, faithfully and honestly.
THE SAME has been accepted by
both the parties on the terms and conditions, corrections, corrigendum
contained in the tender as modified as well as the letter of acceptance
Issued party No. 1 annexed here to as.
The same shall be binding on both the
parties.
IN WITNESS
WHEREOF, the parties have signed the deed of agreement on the date, month
and year referred to above.
At New Delhi.
WITNESS
1.
_______________________________
Party No. 1
2.
_______________________________
Party No. 2
|
| |
Pragati Bhawan, Pragati Maidan, New Delhi-110 001,
E-mail : info@itpo-online.com
|
|